autogere autogere

ADVANCED SILVER/ZINC MINE PROJECT

ABCOURT-BARVUE PROJECT

 

The Abcourt-Barvue property is conveniently located at Barraute, 60 kilometers (35 miles) north the mining community of Val-d’Or, Quebec. It covers 5,865 hectares with 139 claims and two (2) mining concessions held 100% by Abcourt.

In 1950, zinc was discovered on surface on the Barvue claims. The mine was operated from 1952 to 1957 with an open pit by Barvue Mines Limited and from 1985 to 1990 with an underground operation by Abcourt Mines Inc.

From 2002 to 2007, several drilling programs, technical and environmental studies were completed or were done to provide data for a feasibility study and to support our applications for permits. Subsequently, various alternatives were considered to improve the profitability of this project.

In May 2006, a revision of the Abcourt-Barvue resources was completed by an independent qualified person, Mr. Jean-Pierre Bérubé, P.Eng., consultant for MRB & Associates of Val-d’Or, Québec, Canada. This revision was made according to NI 43-101 Standards. This report is available on SEDAR.

Genivar, Limited Partnership of Quebec City and Bumigeme of Montréal, completed a feasibility study, which was published in February 2007. With this feasibility study, almost all the resources were converted into proven and probable ore reserves. This report is available on SEDAR.

A 43-101 report on the Abcourt-Barvue resources was prepared by Mr. Jean-Pierre Bérubé, engineer and independent consulting geologist with pertinent experience in this field. This report indicates an increase in indicated and inferred resources in comparison with those of 2006. This report  was filed on SEDAR.

 

For a description of mining properties see press release under News, the management discussion and analysis in Financial Information and the technical reports filed on SEDAR or under Downloads.

Click on picture to enlarge
 

Click on picture to enlarge
Click on picture to enlarge
 

Click on picture to enlarge

 

Existing foundations for mill

Click on picture to enlarge
 

Click on picture to enlarge

Available mill equipement

Click on picture to enlarge

Click on picture to enlarge

Arrival of large mill drum on Abcourt-Barvue property (June 2008)

Flotation circuit before dismantling. Notice good condition of equipment!

 

VENDÔME PROJECT

Old underground copper, zinc, silver and gold mine with existing shaft and three levels.

The Vendome property is located 11 kilometres (seven miles) south of the Abcourt-Barvue property. It comprises 59 full claims for a total of 2,546 hectares owned 100% by Abcourt.

An evaluation of resources according to NI 43-101 was completed by Mr. Jean-Pierre Bérubé, Consulting Engineer, and a report was published on February 12, 2013. Mr. Bérubé is a qualified independent person. This report was filed on SEDAR.

For a description of mining properties see press release under News, the management discussion and analysis in Financial Information and the technical reports filed on SEDAR or under Downloads.